Auckland's Harbour Bridge was completed in 1959. After being built, it soon struggled to keep with demand. Fortunately, it was able to be widened, with so-called clip-on lanes added a decade later.

It’s a story that shows the challenges of planning for the long term, and the importance of allowing for change and adaptability in the future.